Just checking in… I sent a number of texts and a couple of emails a week / 10 days ago. I figured you were probably both very busy with a number of things, and it might have been difficult to get back to me. A follow up on those items…….I finally had a chance to get copies made for my files of the new exterior elevation drawings I gave you a meeting or two ago. I have dropped those 24″ x 36″ sheets back in the mail to you for your files. I have also reduced them down to 8 1/2 x 11 size, scanned them, and attached them to this email so you also have a smaller, more manageable size sheet.
I have also attached the previous sketch that identified your contractors layout of the new 2nd floor bath…..if you can confirm that it indeed was constructed this way, I will change the PHASE ONE drawings to reflect this as an “as-built” condition. Since it has been completed, there is no sense in showing it as any type of new construction on the documents.
Also, was anything “constructed” with regard to the “attic space” ? If I remember correctly, you indicated you were going to get back to me once you had discussed the possibilities, based on existing conditions, with your contractor. The “attic space” could (?) have implications and affect the PHASE ONE documents depending on what construction, if any, was contemplated or constructed.
If you could zap me back with an update regarding the above when you have an opportunity, it would be greatly appreciated.
As always…THANKS